Opr. WASTE ACID TREATMENT AND WASTEWATER TREATMENT PLANT PT Merdeka Tsingshan Indonesia (Morowali)

PT Merdeka Tsingshan Indonesia (Morowali)

Working Location at Morowali, Central Sulawesi.
Opr. WASTE ACID TREATMENT AND WASTEWATER TREATMENT PLANT
FullTime
IDR 4.500.000 IDR 15.000.000 /month
30 Mar 2023
Kualifikasi:
  • D3 Chemical Engineer or SMK Teknik Kimia minimum.
  • Experience 3 Years as operator Waste Acid Treatment Plant and 5 Years on Wastewater Treatment Plant.
  • Preferably have a certificate of: Certificate WWTP from department of environmental.
  • Certificate Bump test training.
  • Certificate operator sampling from department of environmental.
  • Certificate training for handling H2S gas.
  • Benefit and others: Attractive remuneration package, Skills Upgrade.
  • Working location at IMIP, Morowali, Central Sulawesi.
Tugas & Tanggung Jawab
  • Willing to work night shift.
  • Operate the Waste Acid treatment Plant and Wastewater treatment plant as per training instructions and SOP.
  • Set up, operate, or tend continuous running Wastewater treatment equipment in compliance to the operational standards procedures applicable, in a safety and clean environment.
  • Ensures that all tasks are performed in accordance with approved safety and environmental standards and regulations.
  • Regular check Gypsum Reaction tank and Thickener.
  • Regular check Gypsum Pulp tank and Gypsum Centrifuge.
  • Regular check Neutralization tank and thickener.
  • Benefit and others: Regular check Neutralization filter press. Attractive remuneration package.
  • Regular Daily check check Air all compressor operation and pump, line, pressure make sure pump, pressure dosing waste pump meaning.
  • Regular check operation gas scrubber.
  • Regular check operation centrifuge filter.
  • Adjust reagent dosage as supervisor instruction.
  • Doing regularly sampling.
  • Monitoring operation parameter and recorded in to shift log sheet.
  • Reporting to the WATP and WWTP shift supervisor.
Harus punya keterampilan:
  • Understand with operation WATP &WWTP (Startup circuit, Opertion control, shut down circuits).
  • Knowledge wastewater treatment principles, methods, and practices.
  • Familiar with Absorption towers, centrifugal pump, storage tank, heat exchanger, thickener, Gypsum centrifuge and filter press.
  • Knowledge in emergency response team of chemical spillage.